Homepage

Contact Info.

Effective through December 2008








Below are ESTIMATED Percentage Fees-Based on Anticipated Complexity of the Project 
ARCHITECTURAL PART OF BASIC SERVICES FEES ONLY
CONSULTANTS' FEES VARY CONSIDERABLY AND ARE NOT INCLUDED IN ESTIMATED FEE %
NON-PERFORMING CONTRACTS INCUR A MINIMUM FEE EQUAL TO THE RETAINER








TOTAL CONSTRUCTION COST FOR PROJECT (Sitework Not Included)

Percentage Fee-Based on How Complex the Project is Anticipated to be
ARCHITECTURAL PART OF FEES ONLY-CONSULTANTS' FEES NOT INCLUDED







Retainer
Required
(Credit Applied to final payment)
Range


A

B

C

D

E


F







$1000
   up to  

$ 100,000

10.5%

9.5

9.4

8.5

7.4

10%







$2500
up to

$ 250,000

10.1

9.0

8.9

8.0

7.1

10%







$5000
up to

$ 500,000

9.5

8.5

8.7

7.8

6.8

10%







$7500
up to

$ 750,000

9.2

8.4

7.8

7.5

6.6

10%







$10,000
up to

$ 1,000,000

8.9

8.1

7.6

7.1

6.4

10%







$12,500
up to

$ 2,500,000

8.3

7.5

7.3

6.7

6.2

10%







$15,000
up to

$ 5,000,000

7.5

7.0

6.9

6.5

6.0

10%







Negotiated
over

$ 5,000,000

negotiated

negotiated

negotiated

negotiated

negotiated

negotiated









Architect's Hourly Rates

$130

$125

$120

$115

$100

$100









A LUMP SUM fee may be negotiated but will reflect ALL variables.








Consultants will incur to you rates based on their actual cost and related overhead plus a 20% management fee.










GROUP DEFINITIONS:
"A" -
Complex Laboratories, Medical Hospitals, Emergency Management Centers
"B" - 
Average Laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court Houses, Theatres, Complex University Buildings, Special Purpose Classrooms, Laboratory Classrooms, Libraries, Auditoriums, Museums, Air Terminals, Food Service Facilities, Specialized Detention Areas, Detention-Treatment Areas, Residences
"C" -
Miscellaneous Repairs and Renovations,
Alterations, Tenant Improvements, Code Corrective Work
"D" -
General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities, Factory Buildings
"E" - 
Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive Design Facilities, Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures
"F"-
Homes
Consultant Fees Not Included -
Mechanical, Electrical and Structural, Civil, Landscape, LEED, ETC.
































































ADDITIONAL SERVICES & EXPENSES:





The following services (when requested by the Client) are considered Additional to Basic Services and will require additional fees or hourly compensation and/or the hiring of additional consultants





-Feasibility Studies/ Analysis

 

-LEED Consultation and Filings





-Facility Programming

 

-Graphic and Signage Design





-Master Planning

 

-Special Code Reviews including ACHA





-Soils Investigations/Reports

 

-Detailed Cost Estimates





-Surveys -Topographic/Boundary

 

-Documents Prepared For:





Vegetation/Improvements/Utilities

 

-Alternate Bids Exceeding Contract Scope





-Measured Drawings of Existing Facilities

 

-Excessive Change Orders





-Existing Facilities Analysis

 

-Multiple Construction Contracts





-Toxic Substance Mitigation Surveys and Consultation

 

-Record Documents/As Builts





-Site Environmental Assessments

 

-Prolonged Construction Contract Administration Services





-Site DRI, PUD, Site Plan Review and/or Zoning Modifications

-Structural Threshold Inspections





-Traffic Analysis and Traffic Signal Warrant Studies

 

-Project Representation During





-Civil Engineering Design including Paving/Grading/Utilities

 

Construction Beyond Bi-Monthly Administration





/Drainage/Stormwater Management/Environmental & All Site

-Additional Construction Contract





Permitting

 

Administration Services for Multiple Contracts





-Existing Site Utility Infrastructure Improvements

 

-Building Commissioning and Training Services





-Site Lighting Design

 

-Post Occupancy Inspections/ Evaluations





-Landscape Architectural & Irrigation Design

 

-Renderings/ Models





-Specialty Consultants

 

- Substantive Changes to Scope, Size or Complexity





Voice/Data Communications; Electronic/Audio Visual; Food Service Equipment; Hazardous Material; Hospital/Laboratory; Interior Design; Indoor Air Quality; Quality Control; Theater/Acoustical; Security

 

-Owner Requested Changes to Approved Documents





 

-Reimbursable Expenses*





 

Including, but not limited to, reproduction/ printing costs,





 

travel expenses and special mail service expenses





-Life Cycle Cost (ROI) and/or Federal DOE Energy Analysis

 

 





* As defined in the Agreement Between Owner and Architect - Engineer.*

"additonal services" from website:STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES


Fee checkers
feecheckers